Admin مدير المنتدى
عدد المساهمات : 18648 التقييم : 34514 تاريخ التسجيل : 01/07/2009 الدولة : مصر العمل : مدير منتدى هندسة الإنتاج والتصميم الميكانيكى
| موضوع: مشروع تخرج بعنوان Greater Cairo Metro System الجمعة 20 ديسمبر 2019, 10:13 pm | |
|
أخوانى فى الله أحضرت لكم مشروع تخرج بعنوان Greater Cairo Metro System Graduation Project Construction Engineering and Utilities Department Construction Engineering and Management Line (3) – Phase (2) Prepared By: Mahmoud Ibrahim Behery - Mahmoud Al-Mahdy Mahmoud Mohamed Mostafa Hussein - Mohamed Nagy Fouad Mohamed Rafat Ahmed - Mahmoud El-Sayd Nazmy Supervised By: Dr. Adel El- Kelesh Eng. Ahmed El - Sayed
و المحتوى كما يلي :
Contents Pages 2 0 1 3 Chapter 1: Introduction .1-8 Chapter 2: Tunnels 9-76 - Definition - Tunnel construction methods - Cut and cover method - Pipe jacking method - Classical method - NATM method - Advantage and disadvantage for each method - Comparison - Tunnel construction in Egypt Chapter 3: Construction of line (3) – phase (2) 77-112 - Introduction - In General :- - General description - TUNNEL EXCAVATION • General • Confinement of the excavation chamber • Principle • EPB system description • Tunnel progress in normal conditions • Excavation • Mortar injection behind the segment • Excavation with the cutter-Head • Description of Cutter Head Structure • Description of permanent Cutting system • Excavation , roll correction and over cutting • Mortar injection • Description of the injection system • Operation of the mortar injection system • Supply of mortar to the TBM • TBM shield advance and steering • General • Description of the main thrust unit • Advance and steering control • Tail skin grease injection system • Tunnel mucking • Screw conveyorContents Pages 2 0 1 3 • Screw safety gate • Screw – conveyor discharge gate • Screw conveyor operation • Belt conveyor - Tunnel lining ( ring ) erection • Tunnel lining • Characteristics of the precast segments • Key selection Chapter 4: Construction Method of Haroun Metro Station. . 113-180 - Introduction of Haroun Station - Construction Method of the station - Guide wall • Definition • Resources used in construction of guide wall • Construction Method of guide wall - Diaphragm Wall • Definition • Resources used in construction of diaphragm wall • Construction Method of diaphragm wall - Barrettes • Definition • Resources used in construction of barrettes • Construction Method of Barrettes - Slabs • Definition • Resources used in construction of slabs • Construction Method of Slabs - Columns • Definition • Resources used in construction of columns • Construction Method of Columns - Design Consideration for deep excavation - Planning of subsurface investigation and laboratory testing • Field Tests • Laboratory test - Evaluation of Foundation of adjacent properties and their tolerances - Building Damage due to Ground movement - Selection of type of retaining wall • Sheet pile wall • Soldier pile wall • Contiguous bored pile wallContents Pages 2 0 1 3 • Secant pile wall • Diaphragm wall - Selection of support system - Comparison between all types of retaining wall - Method statement of diaphragm wall - Why is the use of diaphragm wall in station? - Drilling diaphragm wall - Diaphragm wall construction using grab excavation - Diaphragm wall Construction using trench cutter - Comparison between hydraulic grab and hydro-fraise - Method statement of station - Top down - Bottom up - Comparison between top down and bottom up Chapter 5: Special Issues 181-193 Chapter 6: Management of Haroun station .194-289 - Cost Estimate & Tendering - Planning & Scheduling - Resources Management - Financial Management Chapter 7: Risk Management 290-291 Chapter 8: Safety .292-317 References . 318 Appendices 319-332
كلمة سر فك الضغط : books-world.net The Unzip Password : books-world.net أتمنى أن تستفيدوا من محتوى الموضوع وأن ينال إعجابكم رابط من موقع عالم الكتب لتنزيل مشروع تخرج بعنوان Greater Cairo Metro System رابط مباشر لتنزيل مشروع تخرج بعنوان Greater Cairo Metro System
|
|